Open in the appOn this page
A deal is a sale that happened, with its buyer and value. A deal is created when a warm lead is marked Won, or added by hand.
The list shows the newest deals first, 25 at a time; the pages are below it, and the line above it says which ones you see ("Showing 26–50 of 60 deals").
- Search: to find a deal, type part of the buyer's name or the item in Search buyer or item; Clear filters shows them all again.
- Filters, next to the search (one of these filters works at a time; click one again to see every deal):
- Needs a plan (3) shows only the deals that have no payment plan yet (a cancelled plan counts as none), with how many there are.
- Overdue (2) shows only the deals with overdue installments, with how many there are.
- Due this week (4) shows only the deals with a payment due from today through the next 6 days (the same payments as Due this week on Payments due), a list to call this week.
- No reminders (2) shows only the deals with a confirmed plan whose payment reminders reach nobody: the buyer opted out, is on the do-not-contact list, or has no phone or e-mail the reminders can use. The deal page says the same reason under each payment. Call or write to these buyers yourself. When there are very many deals, the count ends with +.
- What a row shows: the payment plan starts with a small dot: red when a payment is overdue, green when the plan is paid off, grey otherwise. When a deal's active plan has installments past their due date that are not fully paid, its row adds · 2 overdue (the same installments as the Overdue list on Payments due). Under it, Next: Rp 50.000.000 on 15 Dec 2026 says the active plan's next payment: the earliest one due today or later that is not fully paid, with what is still owed on it (for a part-paid one, the rest). A draft or completed plan, or one whose open payments are all overdue or still waiting for their milestone date, shows no Next.
- Export CSV, at the top of Deals, downloads the deals of the list you see (the search and the filter in use, every page of it) as a file for a spreadsheet or your accountant. Its columns: buyer, phone, email, do not contact (yes when the buyer opted out or is on the do-not-contact list), item, value, currency, won date, plan, installments paid, paid, remaining, overdue installments, next payment date, next payment amount and, last, the deal's ID. A draft plan, not confirmed yet, leaves paid, remaining and overdue empty, as Payments due counts confirmed plans only. The file's name says the filter. Sample deals are never in the file of a real portal: when the list shows some, a line under Export CSV says Sample deals are not included in the export. Admins, Managers and Finance can export; each export is recorded.
Add deals
- One deal: on Deals, click Add deal, fill in the buyer, item, value and date, then Save deal.
- After a meeting: Record deal on a meeting marked Done (in the Calendar) opens the warm lead's Won dialog; the deal is then made from the won lead, as from Warm leads.
- Many deals: click Import deals and paste rows with the headers buyer, phone, email, item, value, won date, terms, or pick a file under Or choose a CSV file (it fills the box). Download example sheet gives a CSV with these columns in your Playbook's language and two made-up buyers named Contoh: (or Example:): replace them with your buyers or delete them, because a row still named that way is never imported (this is an example row). Nothing is saved while a row has a problem.
A deal's page shows the buyer's phone number and e-mail under their name: tap the number to call them or the e-mail to write from your own mail app, for example to follow up a payment. For a buyer who opted out or is on the do-not-contact list the number and the e-mail stay plain text, with the red line Do not contact: this buyer opted out or is on the do-not-contact list. under them, and a Sample deal's contact is never a link. WhatsApp messages are written in the app, so they stay with the deal.
A typo in a deal's item, won date or terms (from an import or a hand entry) is fixed on the deal's page with Correct deal details, next to Correct contact: change what is wrong and Save. An item named exactly like one of your catalog items links the deal to it. The value, the buyer and the payment plan stay as they are, nothing is sent, and the deal's History says what was corrected (for example Deal details corrected: item Villa 2 kamar → Villa 3 kamar). It is for Admins, Managers and Finance; a Sample deal and a shared demo login cannot change it.
Onboard a buyer
On property portals a deal shows the card Onboard buyer · n of 6 done with its six steps (Unit, Buyer, Payment plan, Contract, Signing, Done). Onboard buyer (or Continue onboarding) opens the first step that is not done; each step writes this deal's own unit, buyer, plan and contract. See Onboard a buyer.
Make a payment plan
- Open the deal. If it has no value yet, enter it first (Enter value).
- Under Make a payment plan, choose From a template (for example a first payment percentage, then monthly installments) or From one sentence, in English or in Bahasa Indonesia. The sentence reads DP, uang muka or first payment for the first payment; sisanya, pelunasan or the rest for one last payment, which the draft calls Remaining payment; and cicilan, per bulan or monthly for installments. Dates can be written in Indonesian too (1 Desember 2026), or counted: "hari ini" or "today" is your portal's date, "besok" or "tomorrow" the day after, "3 bulan kemudian" or "3 months later" three months after the date before it, and "3 bulan lagi" or "3 months from now" three months after today. A percentage paid "saat tanda tangan" or "at signing" is the first payment. A date after "sisanya" or "the rest" belongs to the rest; a DP (uang muka, down payment) or a payment at signing with no date of its own is today, and the rest counts from it (installments with a written start keep that start: "DP 30% lalu sisanya 6 kali cicilan bulanan mulai 1 Desember 2026" is the DP today and installments from 1 December) ("50% saat tanda tangan, sisanya 50% tiga bulan kemudian" is 50% today and 50% three months later). The draft shows both dates before you confirm. For example:
- "30% first payment on 1 December, then 3 monthly installments"
- "DP 50% tanggal 1 Desember, sisanya 1 bulan kemudian"
- "50% saat tanda tangan hari ini, sisanya 50% tiga bulan kemudian"
- Click Make draft. Change dates or amounts in the draft if needed; the total must equal the deal's value. A sentence that leaves something unclear asks instead of guessing. The reason stays under the sentence until you change it, and it names everything that is missing, for example The sentence does not say how many installments.
- Installments without a number ("sisanya dicicil per bulan"): it asks how many installments.
- A span instead of a rhythm ("the rest within a year", "sisanya dalam setahun"): it asks how many installments and how often.
- Two different rhythms in one sentence (monthly and per year): it asks how often.
- No date: it asks for the first date.
- "Dalam 3 bulan" or "within 3 months" is not read as a date (it can mean a span): it asks. In English, "in 3 months" is three months from today.
- Any other first payment without its own date ("30% first payment, the rest 3 months later"), a first payment with a time it can't read as a date ("DP 50% bulan depan", "tgl 20", a weekday or a month name such as "DP 30% Jumat", "Desember" or a short "Des" with no day next to it ("5 Des" is a date); also when the rest is in installments; a unit or size such as "tipe 36", "unit 12B", "LT 120 m2" or "2 unit" is not a time), or a rest with no date at all ("DP 50%, sisanya 50%"): it asks for the first date.
- A first payment and a rest that do not add up to 100% ("50% saat tanda tangan, sisanya 40%"): it asks for a first payment and a rest that add up to 100%.
- Click Confirm plan. Only after confirming do the schedule and payment reminders run. A payment dated in the past gets no reminder before its date, but up to 7 days after it the late reminders still go: the draft names those days, and the confirm box counts such payments. If a buyer already paid one (for example before you used the app), record it as paid right after you confirm, before its next reminder. If the buyer has opted out of messages, is on your do-not-contact list, or has no contact for the way their messages go (for example only an e-mail while their chat is on WhatsApp), no reminder reaches them at all: the draft says so (whatever its dates) instead of naming days, Confirm plan does not promise reminders, and the confirmed plan says why.
Cancel a plan
An active plan with no confirmed payment yet has Cancel plan: say why, and its reminders stop, and its open payment tasks (for example an overdue payment or a late promise) close with the note "The plan was cancelled." Once any payment is confirmed on the plan, also part of one installment, there is no Cancel plan, so money already recorded stays in Payments due; the page says "A payment on this plan is confirmed, so the plan stays." While a payment proof waits for Finance, there is no Cancel plan either: Finance reads "A payment proof on this plan is waiting. Confirm or reject it first.", and an Admin or Manager reads "A payment proof on this plan is waiting for Finance. You can cancel the plan once Finance confirms or rejects it." A cancel never rejects a proof by itself, since it can be real money the buyer sent. A cancelled plan counts as no plan, so the deal shows under Needs a plan again and you can make a new one; the deal page says how many earlier plans were cancelled. On a shared demo login a note stands where the button would be: "This is a shared demo login, so a payment plan cannot be cancelled here."
Payment reminders
Once a plan is confirmed, the buyer is reminded automatically 3 days before, on the due date, and 1, 3 and 7 days after, while the installment is unpaid. A payment due at a milestone gets reminders only once its date is set (see Set the date below), and while the buyer's onboarding is open, reminders wait until the contract is signed. While a buyer's wish to withdraw waits for a person (The buyer may want to withdraw: a person decides under Needs reply), none of their reminders go, on any of their deals, and none is cancelled: the lead page and the Needs reply row say Reminders paused while a person decides. Only an Admin or Manager (on the lead page) or Finance (with Mark as handled next to Held: a person is deciding on the buyer's withdrawal on the deal page) can mark it as handled; Sales sees it and replies, and reads An Admin, Manager or Finance decides this one. When you mark it as handled without withdrawing the buyer, the latest reminder that came due meanwhile goes once and the schedule goes on; the ones missed meanwhile are not sent. Finance still gets the Overdue task on its day; from then on that task takes over the payment. To withdraw the buyer, use Withdraw buyer on Onboard a buyer.
Each reminder names the payment as the buyer portal does, with its place in the plan after it ("Cicilan 1 (pembayaran ke-2 dari 4)" / "Installment 1 (payment 2 of 4)"), its amount and due date, and the reference to write on the transfer, in your Playbook's language: "Berita transfer: A-12-2." or "Reference to write on the transfer: A-12-2.". It is the same reference the buyer portal, Copy payment details and the payments export show: the main unit's code and the payment's number, or for a deal without units the last 6 characters of the deal's id (for example AB12CD-1). The reminder for the rest of a part-paid payment keeps that payment's number. A bank statement line carrying it goes to that payment first (see Bank statement). Each reminder ends by asking a buyer who has already paid to send the transfer photo. When the buyer can sign in to the buyer portal (they have set their password from the invite), it reads "Kalau sudah transfer, mohon kirim foto bukti transfernya di sini atau upload di portal pembeli Anda, supaya bisa kami periksa." ("If you have already paid, please send a photo of the transfer here or upload it in your buyer portal so we can check it."). Without one, it asks only for the photo in the chat ("Kalau sudah transfer, mohon kirim foto bukti transfernya di sini, supaya bisa kami periksa." / "If you have already paid, please send a photo of the transfer here so we can check it."). A photo e-mailed back or uploaded in the buyer portal waits under Proofs waiting like any other proof. A photo sent on WhatsApp opens an Unclear payment task on Payments to check; once someone adds it as the payment's proof, the task closes by itself. When a buyer asks when their next payment is due, the assistant answers with its amount, its due date and the same reference, in your Playbook's language. Like the buyer portal, a payment already late says so with its days ("telah jatuh tempo pada 15 November 2026, terlambat 8 hari" / "was due on 15 November 2026, 8 days late"), one due today says "jatuh tempo hari ini" / "due today", and a part-paid one names only what is left ("sisa Cicilan 1 … sebesar Rp 50.000.000" / "the rest of Installment 1 …, Rp 50.000.000"). A payment whose proof you are still checking is never named as due: the answer names the next payment still owed, and when only payments being checked are left it says so ("Pembayaran Anda sedang diperiksa: …", as the buyer portal does). A stage waiting for its date is named at its milestone ("jatuh tempo saat Struktur selesai. Kami akan memberi tahu tanggalnya."), never with the estimate.
Each payment row says what happened to its reminders: how many were sent, the date of the next one, or why none go (for example none go (on the do-not-contact list)). When a reminder is held, the row says why instead of a date (for example held (proof of payment waiting for confirmation), held (a person is deciding on the buyer's withdrawal) or none go (a person is handling this payment)), the same reason as Reminders going out on Payments due. When the buyer may want to withdraw before the contract is signed, the row names the withdrawal instead of the signature hold (a proof waiting for your confirmation or an escalated payment is still named first); the signature hold shows again once the withdrawal is handled. When the buyer promised a date to pay, the row says Buyer said they will pay on 16 Nov 2026; once that day has gone by without the payment, it adds (passed), as Payments due says promised …, passed. When a buyer answers a reminder with the day they will pay, that day is kept as their promised date, on the payment they still owe (never on one whose proof you are still checking: the next payment due takes it), and they get "Terima kasih. Kami catat rencana pembayaran Anda pada 28 November 2026." ("Thank you. We have noted that you plan to pay on 28 November 2026."). That works for a date ("tanggal 28", "28 Nov"), "besok", "lusa" or "tomorrow", and a day of the week ("Saya bayar hari Jumat ya", "I'll pay on Friday"). A day of the week is the next such day; the same day counts only with "hari ini" / "today". "Jumat depan" / "next Friday" is the one after that, and a day said as past ("tadi Senin", "last Monday") is not a promise: the buyer is asked for the date. "Besok", "lusa", "hari ini" and a day of the week always count from the day the buyer wrote, in your portal's time zone, even when the answer goes out later (for example after your contact hours). If that day has already gone by when the answer goes out, it is not kept: the buyer is asked for a new date instead. When the reply names no day, the buyer is asked "Tanggal berapa rencana pembayaran Anda?" ("On what date do you plan to pay?"). When every open payment is being checked, no date is kept: the buyer reads that their payment is being checked ("Pembayaran Anda sedang diperiksa: …").
Correct the buyer's phone or e-mail
When the buyer's phone number or e-mail has a typo, payment reminders cannot reach them. On the deal's page, click Correct contact under the buyer's name, fix the phone or the e-mail, and click Save contact.
- The number is stored the usual way (for example 0812 3456 7890 becomes +62 812-3456-7890). A number or address that cannot be read is refused.
- Payment reminders go to the lead the deal is linked to, using the lead's own contact. Also update the lead corrects it there too; it is already ticked when the lead has the same old phone or e-mail as the buyer (the usual typo case), and not ticked when the lead's contact is different. Untick it to change only the buyer on the deal.
- A deal without a linked lead says so on the card: This deal has no lead yet: its payment reminders will use the buyer's contact when a plan is confirmed. Then Also update the lead is not shown, and the corrected contact is the one reminders use.
- Before you save, the card says where payment reminders will go, for example Payment reminders will go to +62 812-3456-7890 from now on. or Payment reminders still use the lead's number +62 813-….
- The same buyer on other deals gets the corrected contact too. When another buyer or another lead already has that number or address, it is refused: check the number, or open that buyer or lead.
- Nothing is sent when you save. When the corrected contact is on the do-not-contact list, the message after saving says so, and no reminder goes to it.
- The deal's History shows who corrected the contact, from what to what. With Also update the lead, the lead's conversation shows it too; when there were already WhatsApp messages with the old number, the line adds Earlier WhatsApp messages were with the old number., so a reply above it (for example a stranger's "salah sambung") is not read as the buyer's.
Admin, Manager and Finance can correct it; not on a Sample deal.
Payments to check
Payments to check (in the menu under Deals & payments; the number beside it is how many are open; it was called Payment tasks) lists payments that need a person, one row per task. Admin, Manager and Finance see it. Each row starts with a dot and the task's kind (red while it is open, grey once done). A task is made by itself when:
- Overdue: a payment is still unpaid 7 days after its due date, when its last reminder has gone, or later if your portal waits 14 or 30 days (see Task for an unpaid payment). The task says whether that last reminder reached the buyer; if it did not (for example the buyer is on your do-not-contact list, or the conversation was paused), it says why, so you know nobody has reminded them.
- Dispute or Hardship: the buyer disputes the payment or the amount, or says they have trouble paying. The task holds the reminders of the payment the buyer still owes (never one whose proof you are still checking). Asking to split a payment or change the plan ("bisa dicicil 2x?", "boleh bayar setengah dulu?"; only asking whether the unit can be paid in installments is not) and waiting for pay day with no date ("nunggu gajian dulu") are Hardship too.
- Unclear payment: the buyer says they already paid, or asks whether their payment came in ("transferan saya sudah masuk?", "sudah masuk ke rekening?"; a question about a document or a group is not one), and no confirmed payment matches, or a payment came in above what was due. When the buyer only says they already paid, without a file, their answer also asks them to send a photo of the transfer in the chat (or upload it in the buyer portal, when they can sign in to it), as the reminders do. A transfer photo or file (a file that could not be kept does not count) the buyer sends in a message of its own counts as the file too, with or without a caption, when it comes just before the words (within the last 24 hours, with nothing from you in between except the answer to that photo) or just after them, before the answer goes out.
- Late promise: the buyer promises to pay later than that same number of days after the due date (7 unless your portal changed it).
- Opted out, plan active: the buyer asked not to be contacted while their plan runs. Their reminders stop.
- Buyer withdrew: refund or keep: a buyer withdrew from onboarding after a payment was confirmed; decide whether to refund it or keep it (see Withdraw a buyer).
When your portal's AI is on, the assistant also reads a buyer's reply that these rules could not place (for example "Just checking the money reached you"). It places it in one of the kinds above, or as a question about the due date or the account, only when the buyer's own words show it; the task then ends with Read by the assistant: …. When it is not sure, the AI is off or out of credits, or the reply looks like an instruction, it stays Unclear payment as before. It never marks a payment paid and never changes an amount, a plan or a date: a promised date is read only from the date the buyer wrote. Sample deals never use the AI for this.
Assigned to me (2), next to Open and Done, shows only the tasks assigned to you, with how many there are; click it again to see everyone's. To find one buyer's tasks (for example when they call), type part of the buyer's name or the item in Search buyer or item: Open, Done and Assigned to me keep the search and count only the tasks it finds; when none matches, the list says No task matches "…". Clear filters drops the search and Assigned to me and stays on Open or Done.
A task about one payment shows that payment's amount, its due date and what is paid so far, as on the deal's plan, so you can see what is owed without opening the deal. A new task goes to the first Finance member, or to the first Admin when there is no Finance (in a Sample portal, to its demo Finance login, else its demo Admin); Assigned to shows who has it, and you can give it to someone else. When it is handled, click Mark as done and write What was done?. While a task about one payment is open, that payment shows Escalated on the plan and its reminders wait, except for a Late promise task: the payment stays Due or Overdue and its reminders follow the buyer's promised date; Mark as done on its last open task puts it back to what it really is: Proof received when a payment proof still waits for Finance (its reminders keep waiting), otherwise Due or Overdue by its due date. Open and Done switch between the two lists. Each shows 50 tasks at a time (open: the oldest first; done: the latest first); past 50, a line says which ones you see ("Showing 1–50 of 72 open tasks") and the pages are below the list.
Task for an unpaid payment
Near the bottom of Payments due, just above Payment plan templates, Task for an unpaid payment sets when Finance gets the Overdue task: 7 days after the due date (the default, when the last reminder goes), 14 days after the due date or 30 days after the due date. Admin and Finance can change it; others see the day in use. The buyer's reminders do not change (3 days before, on the due date, and 1, 3 and 7 days after), and a payment still shows as Overdue from the day after its due date. The same number decides when a buyer's promise to pay counts as a Late promise. A change applies at once to payments still waiting for their task: lowered from 30 to 14 days on day 10, the task comes on day 14; a day that has already passed gives the task straight away. Tasks already made stay.
Payment plan templates
Under Task for an unpaid payment on Payments due, Payment plan templates lists the plans From a template offers on a deal, besides one payment in full. Until you save your own, they are your industry's built-in templates (for property: 30% down, then 3, 6 or 12 monthly payments).
An Admin or Finance can change them: give each template a Name, the Down payment (%) (0 for none), the Payments after the down payment and the Months between payments (the first two follow your industry's name for the first payment: Down payment for property, First payment on General portals, Kick-off payment on B2B services), then click Save templates. Up to 8 templates. Once you have saved at least one, your list replaces the built-in templates; Use the built-in templates asks first, then brings those back. A template only fills in a draft: you can still change every value before you confirm the plan, and plans already made stay as they are.
Templates in stages
At the top of each template, choose its type: Down payment + equal payments (the fields above) or Stages, for plans in uneven parts such as 10% at booking, 40% when the structure is complete and the rest at handover. Each stage has:
- a Name (for example Booking);
- a Share: a % of the price, a fixed Amount, or The rest (one stage at most takes what is left, so the plan fits any price; with a fixed amount, one stage must take the rest);
- when it is Due: After … months (counted from the plan's first date; the first stage is always due on that date), or At a milestone, with the milestone's name (Structure complete) and an Estimate in months. The estimate only orders the plan: a milestone payment gets no reminders and is never late until Finance sets its real date (see Set the date below);
- Split into payments (dated stages): that stage's share in several equal payments, every few months.
Up to 12 stages. Under them, a line adds the shares up as you type ("10% + 40% + 50% = 100%"), says what is wrong in plain words ("add 10% or a stage that takes the rest"), and shows what the stages mean on Rp 1.000.000.000. A stage that starts before the one above it ends says so on itself: the order is the date order. Property portals start with one example, Example: stages (10% now, 40% at structure, the rest at handover); it is never chosen for you in From a template.
Set the date
A plan from a Stages template shows a waiting payment as At Structure complete, with "date to set · estimate Mar 2027" and a grey Date to set chip (amber Estimate passed once the estimate is behind us; never Overdue). In a draft, you can also mark any payment after the first one Paid at a milestone; its date then reads Estimate. When the milestone's date is known, an Admin or Finance person clicks Set the date on that payment and picks a date from today on, not before the payment above it and not after the dated payment below it. Reminders then start from that date as for any payment (the buyer gets the usual one 3 days before). The date cannot be changed here once set; the deal's History says "Date set for Structure complete: 12 Mar 2027" and who set it. Until then none of them shows your estimate: the buyer portal says "At Structure complete, date to follow", the payment schedule and the agreement show At Structure complete instead of a date (on the schedule with the status Date to follow), and a receipt says "due at Structure complete". A buyer may pay such a payment early; once it is paid in full it is simply paid. On a shared demo login there is no Set the date. Admins and Finance see every payment waiting for its date under Dates to set on Payments due (more).
Deal history
At the bottom of a deal's page, History lists who did what to the deal and its payments, newest first, with the date and time in your portal's time zone:
- the deal added, imported or made from a won lead, and its value changed;
- the payment plan drafted, edited, confirmed, completed, discarded or cancelled (with the reason given);
- each proof of payment added, confirmed or rejected (with the reason), and each payment recorded by hand or from a bank statement line, with its amount and paid date;
- a payment reversed (with the reason) and the plan open again, an extra payment applied to another payment or taken back, and a milestone payment's date set ("Date set for Structure complete: 12 Mar 2027");
- payment tasks opened, given to someone (with which task: its kind and payment) and done (with the note).
Each line names the person who did it. Assistant means one of your portal's automatic checks, API key with its name means a connected system such as your CRM, A former member is someone whose account was removed, and System means an automatic step, such as a payment task the portal opened for a payment long overdue. On a sample portal, someone from the platform team or from a real portal shows as their role (for example Administrator), or A team member, never by name; the sample people keep their names. A reason or a note longer than 200 characters is cut short. The History only shows what was recorded; nothing on it can be changed. It shows the newest 10 lines first; Show all opens up to 50, and the card says so when there are older ones. Admin, Manager and Finance can see it, like the deal itself.
Payment schedule for the buyer
Once a plan is confirmed, open the deal and click Payment schedule. You get one page to print or save as PDF and give to the buyer.
- At the top: the portal's logo and name with its business contact (the address, phone and e-mail set in Settings; a part not set is left out), the buyer, the unit and the total. The page is in your Playbook language (Indonesian or English), like the receipt.
- One row per installment with its due date, amount and status: Paid, Proof received (the buyer sent a proof that is not confirmed yet), Due or Overdue. A payment waiting for its milestone shows At Structure complete instead of a date, with the status Date to follow.
- Paid so far and Remaining.
- How to pay: the payment details approved in the Playbook. If none are approved yet, the page tells the buyer to contact your portal instead; add the details in the Playbook first.
Click Print, then choose your printer or Save as PDF. The page fits one A4 sheet. Nothing is sent to the buyer; you decide how to give it.
Admin, Manager and Finance can open it. A draft plan has no schedule yet.
Agreement draft
Open a deal and click Agreement draft for a sales agreement made from the deal, to print or save as PDF and sign by hand. On a property portal you can also use your own contract: see Contracts. Once the portal has a confirmed contract, the link moves into the Contracts card's ··· menu as Simple agreement draft.
- At the top: your portal's logo and name, Agreement draft and Draft: not signed.
- Seller (your portal, with the address, phone and e-mail from Settings under Business contact) and Buyer (the deal's buyer, with phone and e-mail).
- What is sold: the item and the price, exactly as on the deal.
- Terms: the deal's own terms text.
- Payment plan: each payment with its due date (At Structure complete for one waiting for its milestone) and amount, and the total. A plan that is still a draft says Draft plan: not yet confirmed.
- Signatures: a signature line, name and date for the seller and for the buyer.
Every name, amount and date comes from the deal, its plan and your portal; nothing is written for you. What the deal does not have prints as a blank line to fill in by hand, and a list above the page names it. The seller's address, phone and e-mail come from Settings (Business contact); one that is not set prints as a blank line. To fill the rest, add the missing value, terms or plan on the deal, or the contact in Settings, and open the draft again.
Click Print, then choose your printer or Save as PDF. The page prints on A4; a long plan goes on to the next page without splitting a payment. A Sample deal says so on the paper.
Admin, Manager and Finance can open it, like the deal itself.
Copy payment details
On a deal with an active payment plan, Copy payment details at the top copies one ready text to paste into a chat with the buyer, in your Playbook's language: in English when it is English, otherwise in Indonesian ("Pembayaran berikutnya: Cicilan 2, Rp 100.000.000, jatuh tempo 15 Februari 2027."). A portal that has not set up its Playbook yet gets Indonesian, the same as its buyer portal and reminders. The button and everything else on the page stay in English. The text has:
- any payment whose proof you are still checking, with what is open on it and its reference: "Installment 2 · Rp 100.000.000 is being checked (reference A-12-2). We will confirm it once the money has arrived.", as the buyer portal says. It is never the next payment;
- the next payment that is still open, with what is still owed on it and its due date. When only stages waiting for their date (a plan in stages) are still owed, it names the first of them at its milestone, as the buyer portal does ("due at Structure complete. We will let you know the date."), never its estimate; once you set the date, that date;
- the reference to write on the transfer for that payment, the same one as in the buyer portal and the reminders ("Reference to write on the transfer: A-12-2.");
- what remains on the whole plan (the same amounts as on Payments due). A payment being checked still counts here until you confirm it;
- while a payment holds money paid above its amount that you have not applied yet, the buyer portal's line for it, under what remains ("Rp 5.000.000 paid extra on Down payment; our team will contact you.");
- How to pay: the Payment details from your Playbook, or, when none are set, a line asking the buyer to contact your portal.
When every open payment is being checked, the text lists them, with what remains, and has no next payment and no How to pay.
It only copies: nothing is sent, so paste it yourself. When your browser does not allow copying, a small window shows the text, already selected: copy it there (or click Select all first), then paste it into the chat. There is no button when the plan is a draft, cancelled or fully paid. On a Sample deal the text starts with a Sample line. Admin, Manager and Finance can use it, like the deal itself.
Payment receipt
Each confirmed payment on a deal's plan has a Receipt link under its status, for a one-page receipt to give the buyer: print it or save it as PDF. A payment with two or more confirmed amounts has a link for each, named by its date.
- At the top: your portal's logo and name with the address, phone and e-mail from Settings (Business contact), Payment receipt, its receipt number, such as RCP-2026-0042, and the day it is printed. The receipt is in your Playbook's language (Indonesian, as a *Kuitansi pembayaran*, or English), and under the amount paid it writes the amount in words (*Terbilang*: "Seratus lima puluh juta rupiah").
- Received from: the buyer, with phone and e-mail; Item and For: which payment of the plan, with its due date ("due at Structure complete" for one waiting for its milestone).
- Amount paid and Date paid, as finance confirmed them, and Paid by: the bank on the proof and the bank statement line, when these were recorded.
- Total of the payment plan, Paid so far, with this payment and Remaining after this payment. Paid so far counts everything confirmed up to that payment, a payment made above what was due too, with the same line as the buyer portal ("Rp 10.000.000 dibayar lebih untuk Uang muka. Tim kami akan menghubungi Anda."); Remaining is what was still open then, an extra already applied to a later payment counted (with the portal's line "…, dipakai untuk Cicilan 1." on that later payment's receipt). So the latest receipt matches the buyer portal and Copy payment details. A receipt keeps its figures when you print it again later, also after an extra is applied or taken back, a later payment is confirmed or a payment is reversed: it shows that payment's own moment, when finance confirmed it.
- At the bottom: **Payment receipt from *your portal's name* records. Not a tax invoice.**
Receipt numbers run per portal and per year (RCP-2026-0001, RCP-2026-0002, …, then RCP-2027-0001 from 1 January), given when Finance confirms the payment, so your books show no gaps. The number stays the same each time you print the same payment, and a reversed payment keeps its number (the next payment takes the next one). Payments confirmed before receipt numbers came in keep their earlier reference (such as RCP-4F7K2Q9X). The receipt only reads what is recorded; it is never sent, so give it to the buyer yourself. A proof still waiting or rejected has no receipt, and neither has a cancelled plan. A Sample deal says so on the paper.
Admin, Manager and Finance can open it, like the deal itself.